Project clock
12 signals visible
red stale-dependency first raised 2026-06-26

The warehouse data field has been open since April 2024 — and the chain-wide case now depends on it

Remaining shelf life was first asked about in April 2024. It is captured in the WMS but not exposed; the system owner (Nils Ackermann) was asked twice, in 2024 and 2025. Marco Rossi’s June 2026 written position: for the next number to be different, that field has to be available — it is not a RELEX deliverable, and without it chain-wide will reduce waste by less than the pilot suggests.

Evidence

red unverified first raised 2026-06-16

Three weekly “no errors” reports are evidence of job completion only — and the data does not reconcile

The weekly updates of 12 January, 9 February and 9 March 2026 each report “Nightly article extract completed, no errors”. In June 2026 Nadia Haddad put the extract totals next to the till numbers for January–March: “They do not reconcile. The extract is lower… Nobody has ever checked what was in it.” The 3.4% figure taken to the board in April is derived from those totals.

Evidence

red overdue first raised 2026-03-28

The bake-off split by store format was requested in January and was still only in Sofia’s spreadsheet in March

Action from the partner scoping session (28 January 2026). At the March design workshop Ruth Oyelaran asks for it again and the answer is “I can [send it]” — the archive holds no evidence it was ever sent.

Evidence

red overdue first raised 2025-09-16

DC-2 permanent fix passed its committed date without a completion record

A joint engineering session on 4 June 2025 produced a permanent-fix plan dated 15 September 2025, gated on Acme’s quarterly change window. The archive holds no completion record; the January 2026 incident log still counts fourteen failures (eleven silent), and Meridian was told in February to build assuming “roughly fortnightly failures”.

Evidence

red silent-agreement first raised 2025-08-15

A three-wave rollout was planned as if Acme had agreed it — nobody had

Marco Rossi’s June 2025 three-wave proposal was never answered by Acme. The plan was built on it anyway (“discussed verbally in the June steering and nobody pushed back. I would treat it as agreed.”), with Nadia Haddad’s challenge on record since August. Lena Fischer formally rejected it in November 2025 and Marco admitted: “it was not minuted as a decision, and we built the plan on it. That is our error.” The recorded decision is two deliveries.

Evidence

red contradiction first raised 2025-05-20

A “40 stores” figure circulated in May 2025 after the cohort had been 25 since September 2024

Marco Rossi’s 20 May 2025 email to Robert Kahn described the 90-day headline numbers as drawn from “the pilot cohort of 40 stores”. The cohort was reduced to 25 in September 2024 — so the statement was wrong when written, not overtaken later. Kahn had seen both numbers within a month; the correction came the next day, and the stale figure survived in the kickoff material and a slide until a folder note was added in July 2025.

Evidence

red overdue first raised 2024-05-20

Robert Kahn’s “send me one page” from March 2024 has no completion in the archive

At the demo Kahn asked for one page, not forty. No such page appears anywhere in the 45 documents.

Evidence

amber overdue first raised 2026-03-12

Sofia’s erasure request is months old and still not fully closed

Agreed and owned by Marco Rossi on 19 November 2025. The handover pack was fixed to v4 the same week; the document-history version and the promised list of every other location remain open — “three of four locations done” as of June 2026.

Evidence

amber silent-agreement first raised 2025-10-30

The shelf-life approximation runs on “nobody objected”, not on an agreement

Nadia Haddad proposed the approximation on 4 September 2025; Priya Nair answered “Proceed with your approximation” a week later. When Ana Duarte audited the thread in October she could not find an agreement anywhere; the last word on the thread is “We proceeded. Nobody objected.” The approximation biases slow movers optimistic — on the slowest tenth, possibly two days.

Evidence

amber single-point first raised 2025-06-10

Fresh knowledge still rests on one person — noted three times, owned nowhere

Sofia Almeida is the only person at Acme who understands the fresh categories; she flagged it herself in the demo. The point sat in three risk registers “in slightly different words” — Charlotte Meyer’s verdict: “Then it is in none.” As of June 2026 she still spends about a day and a half a week ordering by hand on the slow-moving lines.

Evidence

amber overdue first raised 2025-03-28

The DC-2 cover promise was made in March 2025 and never evidenced

After the holiday-coverage failure Ana Duarte committed to “a named second person on the runbook permanently by the end of next week”. The archive never records who that was; the fresh cutover in December leaned on the same single-point arrangement again.

Evidence

amber contradiction first raised 2025-03-18

A wrong premise (“a file-size check catches this”) was copied into three documents and left there

Tomas Lindholm withdrew his own cutover recommendation on 18 March 2025: “A file can be the right size and still be the wrong file.” The recommendation still sat in the cutover pack, the runbook and the hypercare plan — written once, copied, and never removed from any of the three.